Commercial project
Deformed Pipework Replacement
Deformed underground pipework was excavated and replaced to restore a clear, reliable drainage run.
KentService area
Holiday parkProject type
Excavation and drain repairWork carried out
The challenge
Assessing the repair
The pipework had become misshapen, affecting its ability to carry wastewater efficiently and requiring an excavation for a permanent repair.
Every commercial drainage project is assessed carefully so that the work can be completed with minimal unnecessary disruption.


The solution
A practical, lasting repair
We exposed the affected run, removed the deformed section and installed replacement pipework before making good the excavation.
- Work planned around the property and its occupants
- Defective drainage or pipework professionally repaired
- Area left tidy following completion
Project gallery
Completed work