Commercial project
Gully and Surface Water Maintenance
A preventative maintenance visit cleared road gullies and storm-water drainage using a tanker unit.
KentService area
Housing estateProject type
Preventative drainage maintenanceWork carried out
The challenge
Assessing the repair
Regular clearance is essential to keep gullies and surface-water runs free-flowing, particularly before periods of heavy rainfall.
Every commercial drainage project is assessed carefully so that the work can be completed with minimal unnecessary disruption.


The solution
A practical, lasting repair
Using our tanker equipment, we cleared the gullies and drainage runs to help maintain dependable surface-water drainage.
- Work planned around the property and its occupants
- Defective drainage or pipework professionally repaired
- Area left tidy following completion
Project gallery
Completed work