Defective pitch fibre pipework was excavated, replaced and the block paving carefully reinstated.
KentService area
Housing estateProject type
Excavation and drain repairWork carried out
The challenge
Assessing the repair
The damaged underground pipework required an excavation to expose the defective section and allow a lasting repair.
Every commercial drainage project is assessed carefully so that the work can be completed with minimal unnecessary disruption.


The solution
A practical, lasting repair
We removed the failed pipework, installed the new section and reinstated the surface so the area was left tidy and usable.
- Work planned around the property and its occupants
- Defective drainage or pipework professionally repaired
- Area left tidy following completion